06 · Production — production orders, BOM, routing, and WIP
Updated
Solution layer. Depends on Common, Inventory,
Costing, HR (shop operator rate), and
Sales. Production turns arbitrary raw materials into arbitrary
finished goods by a bill of materials. The workshop layer — routings, work
centers, and labor accounting — combines with the BOM and the order into a full
production contour.
Purpose#
BillOfMaterials is the BOM dictionary: the composition of any product, with
multi-level expansion. Routing is the route dictionary: the sequence of
operations at work centers. ProductionOrder is the production order document:
in subtypes Draft/Released/Finished it reserves components, consumes them,
accumulates work in progress, and receives the output at actual cost (materials
plus assigned labor).
What is created (object map)#
| Kind | Name | Purpose |
|---|---|---|
| Model | Production |
module model, Solution(2) layer |
| NumberSequence | BillOfMaterialsSeq, ProductionOrderSeq |
numbering |
| EDT | RefBillOfMaterials, RefRouting, RefWorkCenter |
references |
| Dictionary | BillOfMaterials (+ child BomComponent), Routing (+ child RoutingOperation), WorkCenter, ProductionSettings (singleton) |
BOMs, routings, work centers, module settings |
| TablePart | ProductionOrderComponents, ProductionOrderOperations |
required components and order operations |
| Document | ProductionOrder |
production order (Draft→Released→Finished) |
| Register | WorkInProgress |
quantity of product in work |
| Service | IBomService, IRoutingService, IWorkCenterLoadService, ILaborCostService, IProductionComponentAvailability |
BOM expansion, route stamping/load, labor cost, available component balance |
| Script | tx ProductionDraftReserveTx/ProductionConsumeTx/ProductionWipTx/ProductionOutputTx, commands ExpandBom/ReleaseProduction/FinishProduction/ConfirmOperations/ScheduleProduction, order event handler |
postings, transitions, invariants: auto-expansion, availability/labor/trade-profile guards, output costing |
| Menu | menu.json |
module menu |
| — reused — | Item/Qty/Stock/ReservedStock/services (Inventory), ItemCostFifo/InventoryValue (Costing), Employee (HR) |
not created here |
Total: 1 model, 2 number sequences, 3 EDTs, 4 dictionaries (+2 child dictionaries), 2 table parts, 1 document, 1 register, 5 services, scripts, and menu.
model.json#
Solution(2) layer. Dependencies: Common (≥1.10.0),
Costing (≥1.0.0), Inventory (≥1.0.0),
HR (≥1.9.0), Sales (≥1.55.0).
Number sequences#
BillOfMaterialsSeq, ProductionOrderSeq. Routing and WorkCenter use the
default sequence and do not declare their own.
EDT#
RefItem/Qty/RefStoreCell come from Inventory;
RefEmployee comes from HR. The model owns
RefBillOfMaterials, RefRouting, and RefWorkCenter.
Dictionaries#
BillOfMaterials#
| Name String(160) required · Product→Item required · OutputQty Qty required |
- The BOM applies to a batch, not to one unit.
OutputQtyis how many products one recipe run outputs. Expansion is centralized in IBomService. - Composition is the child dictionary
BomComponent, shown as the list on the BOM card. The first live (not disabled) record for aProductwins. This is the same “first line wins” rule asRouting.
BomComponent#
Child BOM lines. FK Bom→BillOfMaterials.
| Component→Item required · QtyPer Qty required (consumption for OutputQty output units) · Unit optional (empty means the component base unit) · Explode Boolean optional |
Explodecontrols multi-level BOM expansion.false(default) requires the component from stock as-is: one-pass expansion.trueexpands the component's own BOM and merges its leaves into the total demand, so an in-house semi-finished product does not need a separate receipt line in stock. A cycle, where a product refers to itself throughExplode, raises an exception during expansion instead of looping silently.
Routing#
A routing is the operation recipe for a product. It uses the same “first live record wins” semantics as BOM.
| Name String(160) required · Product→Item required · IsDisabled Boolean optional |
- Composition is the child dictionary
RoutingOperation. Operation order isSequence.
RoutingOperation#
One routing step. Sequence is unique inside the routing.
| Routing→Routing required · Sequence Integer required · Name String(160) required · WorkCenter→WorkCenter optional · SetupMinutes Integer optional · RunMinutesPerUnit Decimal(18,4) optional |
WorkCenter#
A work center is the section or machine where an operation runs. This version has no physical capacity planning; capacity is reference data only.
| Name String(160) required · IsDisabled Boolean optional · HourlyRate Decimal(18,4) optional — hourly rate used when the marked operation does not name an employee; the employee position rate always wins · CapacityMinutesPerDay Decimal(18,4) optional — 0 means no ceiling is declared; it affects only the load report, not release |
ProductionSettings#
Singleton module settings dictionary (isSingleton, isCached).
| AutoExpandBom Boolean optional — a new order expands the BOM and stamps the route by itself on creation (see Business logic and invariants); without the flag, only the ExpandBom command does it · DefaultOutputLocation→StoreCell optional — default output cell when the order does not specify one |
Documents#
ProductionOrder#
- Header:
Product→Item (required) ·QuantityQty(required, unit isUnit, normalized intoBaseQuantity) ·Location→StoreCell (required) — component consumption cell and WIP accumulation cell ·OutputLocation→StoreCell (optional) — output receipt cell. Empty meansLocation; if ProductionSettings has a default cell, a new order stamps it. Components and WIP always stay onLocation.OutputLocationmoves only the finished product. - TP-Components (
ProductionOrderComponents):Component→Item (required) ·QtyRequiredQty(required, unit isUnit, normalized intoBaseQuantity) — demand for one line. Filled byExpandBomor entered manually. - TP-Operations (
ProductionOrderOperations):SequenceInteger (required) ·NameString(160) (required) ·WorkCenter→WorkCenter optional ·SetupMinutes/RunMinutesDecimal optional (planned time from the routing) ·Employee→Employee optional (who actually did the operation) ·ScheduledOnDateTime optional (planned day fromScheduleProduction) ·ActualMinutesDecimal optional andCompletedOnDateTime optional. The marker for “completed” isCompletedOn, notActualMinutes: an instant zero-minute operation is legitimate and cannot be distinguished from an unmarked operation by minutes alone. - Subtypes:
Draft(initial) →Released→Finished(isReadOnly). The user transition is command-only:ExpandBomis available onDraft, andReleaseProductionandFinishProductionmove the subtype. Programmatic code usesdocument.Subtype/SetSubtypeAsyncin services and tests. - Postings by subtype: a subtype can have any number of tx scripts, ordered
by
executionOrder. The semantics are Mix: postings do not accumulate; the target subtype writes its own set again. ThereforeProductionConsumeTxis not duplicated on theReleased→Finishedtransition.Draft—ProductionDraftReserveTx:+ReservedStock for the demand fromComponents, with analyticsItem/Cell=Location. Nothing is reserved ifLocationis empty or the line has zero quantity or no component.Released—ProductionConsumeTx(−Stock for each component onLocation), thenProductionWipTx(+WorkInProgress forProduct/Location, fullQuantity). TheDraftreserve is removed by Mix:Releaseddoes not contain it.Finished—ProductionConsumeTxwith the same set asReleased(the components are written again, not twice: Mix has already annulled theReleasedconsumption), thenProductionOutputTx(+Stock forProduct/OutputLocation, fullQuantity).WorkInProgressis not written in this subtype: theReleased→Finishedtransition removes it completely.
Registers#
WorkInProgress#
Quantity of product “in work”: Released writes it, Finished removes it
(Mix). It stores quantity only, not cost. The FIFO cost of components has already
left stock in ProductionConsumeTx; this register does not store it.
{
"kind": "Register",
"object": {
"caption": { "en": "Work in progress", "ru": "Незавершённое производство" },
"registerEngineType": "Standard",
"isDoubleEntry": false, "allowNegativeBalance": true, "useBalanceTable": true,
"metaId": "36549e8e-59a3-4a9e-af3d-86aaea866768", "name": "WorkInProgress",
"modelId": "<GUID Model.Production>", "layerId": 2
},
"resources": [ { "fieldName": "Qty", "isOperational": true } ],
"analytics": [
{ "name": "WorkInProgress-Cell", "isRequired": true },
{ "name": "WorkInProgress-Item", "isRequired": true }
]
}
allowNegativeBalance:true means an order can technically be closed after WIP is
already exhausted, for example after manual intervention or a rerun. The
register does not block this; it records what happened.
Services#
IBomService#
ExpandByProductAsync(product, qty) → Dictionary<Guid, decimal> returns the
component demand in the component storage unit. Formula per line:
need = QtyPer × (qty / OutputQty). If the line has Unit, it converts to the
base unit through IItemQuantityConverter. A line with Explode=true
recursively expands the component BOM and merges leaf components into the total
demand. A cycle, where the product refers to itself through exploded components,
raises an exception instead of hanging. This is the single expansion point used
by the ExpandBom command and by order auto-expansion.
IRoutingService#
StampOperationsAsync(orderId) → number of stamped lines. It takes the first
live (!IsDisabled) Routing record for the order Product, clears
Operations, and copies RoutingOperation steps by Sequence, recalculating
RunMinutes = RunMinutesPerUnit × qty for the actual order quantity
(BaseQuantity). A product without a route leaves Operations empty. That is
not an error: a route is not required to release the order.
Technical nuance: the search uses
IDictionaryManager.GetRecordsAsync(the expression path), not typedIDictionaryManager<T>. The typed path round-trips the record through JSON and losesGuidcolumns, soProduct/Routingwould not match in memory.
IWorkCenterLoadService#
QueuedMinutesAsync(workCenter, onDate, exceptOrder), CapacityAsync(workCenter),
ScheduleAsync(orderId), OverloadWarningAsync(orderId) (string?, null means
no warning). The queue includes only operations of Released orders without
CompletedOn. A marked operation leaves the queue immediately even if the order
as a whole is not finished. ScheduleAsync sets ScheduledOn by Sequence and
remaining work-center capacity: the first day that fits the capacity, with empty
ScheduledOn defaulting to the order DocumentDate.
Capacity on a day is CapacityOnAsync(workCenter, day) (decimal?): one
machine's minutes (MachineMinutesOnAsync) × Machines (empty or 0 = 1). One
machine's minutes come from the center's ShiftCalendar — the weekday's
MondayMinutes … SundayMinutes, overridden by a ShiftCalendarException on
that date (one per calendar and date; ShiftCalendarExceptionEventHandler
refuses a second) — or, with no calendar, from CapacityMinutesPerDay every
day. With a calendar, 0 means the day is CLOSED: ScheduleAsync skips it, and
an operation that does not fit one machine's minutes goes to the first open day.
OverloadWarningAsync compares each day's load with that day's capacity and
also names any operation longer than one machine's shift.
Machines are planned one by one: ScheduleAsync writes
ProductionOrderOperations.MachineNo, the first machine with room that day.
Other orders' released operations are read per machine; one without a number
(an older order) counts against the least loaded machine. The warning also
names a machine that overflows on its own while the day's total fits.
ReplanReleasedAsync(fromDate) (command ReplanShop, on Draft and Released) replans all Released orders together: by Priority (descending), RequiredBy (ascending, empty last), DocumentDate, ID; each from max(fromDate, order date); capacity shared only among the orders of the run; confirmed operations keep their day. It returns the late orders (finish after RequiredBy). ProductionOrderEventHandler writes an empty RequiredBy as 1901-01-01, the agreed empty date.
With no calendar, CapacityMinutesPerDay=0 means no ceiling is declared, so
OverloadWarningAsync never warns for this center. Overload is a warning, not
a refusal. Work-center capacity is a plan, not a physical law: overtime and a
second shift are valid. For that reason ReleaseProduction asks for the warning
after release; otherwise it would have to decide whether the order is already in
the queue.
ILaborCostService#
OrderLaborCostAsync(orderId) → decimal: sum for marked order operations
(ActualMinutes × rate). RateAsync(employee, workCenter) gives priority to
the named employee's position rate (HR.Position.HourlyRate) over the
WorkCenter.HourlyRate; if neither exists, the rate is zero.
ProblemAsync(orderId) → string? (null means posting is allowed) is one
predicate, two doors. Negative minutes and fact/route desynchronization are
checked here and only here. The same predicate is called by the posting guard
(ProductionOrderEventHandler.OnBeforePostAsync) and by every cost estimate, so
a negative actual-minute value cannot silently reduce output cost through any
path.
IProductionComponentAvailability#
AvailableForOrderAsync(orderId, cell, item) → decimal: how much of the
component the order can still take from the consumption cell. It is physical
Stock, plus what this same order has already consumed
(Finished does not refuse itself after Released), minus ReservedStock
of other documents. The order's own draft reserve is not deducted; Mix removes
it in the same posting. Used by the posting guard and by ReleaseProduction and
FinishProduction before the transition.
Commands#
ExpandBom (“Expand bill of materials”, on Draft) replaces Components with demand from
IBomService and stamps Operations through
IRoutingService. It refuses if product or quantity is empty,
or if the product has no BOM.
ReleaseProduction (“Release to shop”, Draft→Released) requires
non-empty Components (hint: click “Expand bill of materials”), positive quantity on every
line, and enough component stock at Location (guarded by
IProductionComponentAvailability). After
the transition it asks IWorkCenterLoadService about
work-center overload and shows a warning without blocking.
FinishProduction (“Finish production”, Released→Finished) runs the same availability
checks as ReleaseProduction. Components are not “issued” by the previous
Released check; the order checks its own consumption cell again here.
ConfirmOperations (“Confirm operations”) closes all still-unmarked
(CompletedOn == null) Operations lines by the standard time
(SetupMinutes + RunMinutes, calculated when the route was stamped). Repeating
the button does not overwrite already marked lines: neither time nor employee.
If actual time differs from standard, edit the line manually; subtype Released
does not lock the line.
ScheduleProduction (“Schedule operations”) assigns ScheduledOn by Sequence
and capacity balance through IWorkCenterLoadService.
It is only a plan and does not change the subtype.
Business logic and invariants#
BOM expansion is for a batch and can be multi-level. OutputQty is the
output of one recipe run, and line consumption is
QtyPer × (Quantity / OutputQty). Explode=true recursively expands the
component BOM and merges leaves; Explode=false (default) is one-pass
expansion. IBomService owns the formula; handlers do not copy it.
Draft reserves, Released consumes. After the BOM is expanded, the draft
reserves components in ReservedStock without touching physical stock. Another
document formally sees them as occupied, but can still compete for physical
Stock. The reserve is removed automatically by Mix when the order moves to
Released, where components are consumed from Stock and WIP is created.
Availability is checked on every transition, not once. Both
ReleaseProduction and FinishProduction recheck
IProductionComponentAvailability. The order
cannot “issue” the same component to itself twice: its own consumption is counted
in availability, and other documents' reserves are deducted from the total stock.
The trade profile can disable production completely. OnBeforeSaveAsync and
OnBeforePostAsync ask ITradeProfileService.ProductionBlockReasonAsync()
(Common). A tenant in the buy-sell (BuySell) profile cannot
save or post production orders; the message tells the user to change the profile
in common settings.
BOM auto-expansion is a setting, not default behavior.
ProductionSettings.AutoExpandBom turns on BOM expansion and route stamping on
order creation (OnAfterSaveAsync), only while Components is still empty. A
manual component list wins over the setting. Without the flag, the ExpandBom
command performs the same action.
Output cost is actual, not average. The costing driver has already consumed
components from ItemCostFifo. Negative amounts are
exactly what left stock for consumption. On OnAfterPostAsync, the order reads
those negative amounts of the same document. It does not recompute an average:
average cost diverges from FIFO across batches with different prices, and by the
time of the event the balance is already after consumption, not before it. The
order adds assigned labor and opens a new ItemCostFifo
layer plus an InventoryValue movement for the finished product, symmetric to
how ReceiptCostTx/ReceiptFifoTx open the receipt layer in
Purchasing. An order with no marked operation
has labor cost 0; existing orders from before routings keep their behavior.
Labor without a mark does not exist. The sign that an operation is done is
CompletedOn, not non-zero minutes. An instant operation with 0 minutes is valid
and is distinguished from an unmarked operation only by the completion date.
Internal operation means no tax. There is no seller or buyer, so the tax engine is not called.
Components and WIP live on the consumption cell; output can go elsewhere.
OutputLocation moves only the finished product. If it is empty, the order uses
Location, or the module default output cell for a new order.
Example#
BOM Bread (product “Bread”, OutputQty = 10, so one recipe run outputs 10
loaves): Flour QtyPer = 5 kg, Water QtyPer = 3 l, Yeast
QtyPer = 0.2 kg; all three have Explode = false. An order for
Quantity = 20 loaves gives batches = 20 / 10 = 2 and demand:
Flour = 10, Water = 6, Yeast = 0.4. Consumption cell is Cell-1; output
cell is empty, so it is also Cell-1. Before the order, Cell-1 has
Flour = 50, Water = 100, Yeast = 1.0.
| Subtype | Action | Stock (Flour/Water/Yeast, Cell-1) |
Stock (Bread, Cell-1) |
ReservedStock (F/W/Y, Cell-1) |
WorkInProgress (Bread, Cell-1) |
|---|---|---|---|---|---|
| — | before order | 50 / 100 / 1.0 | 0 | 0 / 0 / 0 | 0 |
Draft |
ExpandBom expands Components; ProductionDraftReserveTx reserves |
50 / 100 / 1.0 (unchanged) | 0 | 10 / 6 / 0.4 | 0 |
Released |
ReleaseProduction: reserve removed by Mix, ProductionConsumeTx consumes, ProductionWipTx creates WIP |
40 / 94 / 0.6 | 0 | 0 / 0 / 0 | 20 |
Finished |
FinishProduction: ProductionConsumeTx again with the same list, not twice; ProductionOutputTx receives output; Mix removes WIP |
40 / 94 / 0.6 (unchanged from Released) |
20 | 0 / 0 / 0 | 0 |
Output cost (OnAfterPostAsync on Finished) with consumption prices
Flour = 2.00/kg, Water = 0.50/l, Yeast = 25.00/kg. These are the costs
that ItemCostFifo already wrote off through the costing driver for
−10/−6/−0.4.
| Component | Calculation | Amount |
|---|---|---|
Materials (from ItemCostFifo, negative amounts of this document) |
10×2.00 + 6×0.50 + 0.4×25.00 |
33.00 |
Labor (ILaborCostService.OrderLaborCostAsync, 1 marked operation: SetupMinutes=10 + RunMinutes=2×20=40, work-center rate 60.00/hour = 1.00/min) |
50 min × 1.00 |
50.00 |
New ItemCostFifo/InventoryValue layer for Bread |
Qty=20 |
83.00 (4.15/pc) |
General-ledger reflection is the order's own: ProductionOrderEventHandler
writes Dr WIP / Cr Inventory on Released (the cost CostingIssue took off
the layers) and Dr Inventory / Cr LaborAbsorbed on Finished. The Released
leg leaves with the flip to Finished; materials out and product in are neutral
on the one inventory account. See
Who writes the general ledger.
Menu#
The Production group → Dictionaries (BillOfMaterials, Routing,
WorkCenter) · Documents (ProductionOrder) · Registers
(WorkInProgress) · Settings (ProductionSettings).
Links with other modules#
- Outgoing: Inventory (
Stock,ReservedStock,IStoreCellService/IItemQuantityConverter), Costing (ItemCostFifo,InventoryValue), HR (Employee, position rate in ILaborCostService), Common (ITradeProfileService). - Ledger: Accounting (
IGeneralLedgerService) and Costing (IInventoryCostGLService) — the order's WIP and labour legs.
Objects#
Generated from workspace metadata by node tools/gen-reference.mjs; edit the metadata, not this block.
Dictionaries#
BillOfMaterials — Bills of materials
| Field | Caption | Type | Required |
|---|---|---|---|
ID |
Code | String(50) | Yes |
Name |
Name | String(128) | Yes |
OutputQty |
Output qty | Qty |
Yes |
Product |
Product | → Item |
Yes |
BomComponent — BOM components
| Field | Caption | Type | Required |
|---|---|---|---|
Bom |
Bill of materials | → BillOfMaterials |
Yes |
Component |
Component | → Item |
Yes |
Explode |
Explode | Boolean | No |
ID |
Code | String(50) | Yes |
QtyPer |
Qty per unit | Qty |
Yes |
Unit |
Qty unit | → UnitOfMeasure |
No |
ProductionSettings — Production settings
| Field | Caption | Type | Required |
|---|---|---|---|
AutoExpandBom |
Auto-expand BOM | Boolean | No |
DefaultOutputLocation |
Default output location | → StoreCell |
No |
DefaultOutputLocationCode |
Default output location code | String(128) | No |
ID |
ID | String(50) | Yes |
Routing — Routings
Operation recipe for a product. First live row wins, same as BOM. Operations are the detail list.
| Field | Caption | Type | Required |
|---|---|---|---|
ID |
Code | String(50) | Yes |
IsDisabled |
Disabled | Boolean | No |
Name |
Name | String(160) | Yes |
Product |
Product | → Item |
Yes |
RoutingOperation — Routing operations
One step of a routing. Sequence is unique per routing.
| Field | Caption | Type | Required |
|---|---|---|---|
ID |
Code | String(50) | Yes |
Name |
Name | String(160) | Yes |
Routing |
Routing | → Routing |
Yes |
RunMinutesPerUnit |
Run minutes / unit | Decimal(18,4) | No |
Sequence |
Sequence | Integer | Yes |
SetupMinutes |
Setup minutes | Integer | No |
WorkCenter |
Work center | → WorkCenter |
No |
ShiftCalendar — Shift calendars
A working week for work centers: minutes per weekday for one machine. Dated overrides (holidays, overtime days) are in ShiftCalendarException. A work center with a calendar takes its daily capacity from it times its number of machines; without one, CapacityMinutesPerDay applies every day.
| Field | Caption | Type | Required |
|---|---|---|---|
FridayMinutes |
Friday, min | Integer | No |
ID |
Code | String(50) | Yes |
MondayMinutes |
Monday, min | Integer | No |
Name |
Name | String(256) | Yes |
SaturdayMinutes |
Saturday, min | Integer | No |
SundayMinutes |
Sunday, min | Integer | No |
ThursdayMinutes |
Thursday, min | Integer | No |
TuesdayMinutes |
Tuesday, min | Integer | No |
WednesdayMinutes |
Wednesday, min | Integer | No |
ShiftCalendarException — Calendar exceptions
A dated override of a shift calendar: a holiday (0 minutes) or a different working day (overtime Saturday, short pre-holiday shift). One per calendar and date; it wins over the weekday.
| Field | Caption | Type | Required |
|---|---|---|---|
Date |
Date | DateTime | Yes |
ID |
Code | String(50) | Yes |
Minutes |
Minutes | Integer | No |
Note |
Note | String(256) | No |
ShiftCalendar |
Shift calendar | → ShiftCalendar |
Yes |
WorkCenter — Work centers
Where an operation runs. v1 is a name on the route; no capacity.
| Field | Caption | Type | Required |
|---|---|---|---|
CapacityMinutesPerDay |
Capacity, min/day | Decimal(18,4) | No |
HourlyRate |
Hourly rate | Decimal(18,4) | No |
ID |
ID | String(50) | Yes |
IsDisabled |
Disabled | Boolean | No |
Machines |
Machines | Integer | No |
Name |
Name | String(160) | Yes |
ShiftCalendar |
Shift calendar | → ShiftCalendar |
No |
Documents#
ProductionOrder — Production order
Header fields:
| Field | Caption | Type | Required |
|---|---|---|---|
BaseQuantity |
Qty in base unit | Qty |
No |
ID |
Number | String(50) | Yes |
Location |
Location | → StoreCell |
Yes |
OutputLocation |
Output cell | → StoreCell |
No |
Priority |
Priority | Integer | No |
Product |
Product | → Item |
Yes |
Quantity |
Quantity | Qty |
Yes |
RequiredBy |
Need by | DateTime | No |
Unit |
Unit | → UnitOfMeasure |
No |
Subtypes:
| Subtype | Caption |
|---|---|
Draft |
Draft |
Released |
Released |
Finished |
Finished |
Commands:
| Command | Caption | Target subtype |
|---|---|---|
ReleaseProduction |
Release to shop | — |
ConfirmOperations |
Confirm operations | — |
ExpandBom |
Expand bill of materials | — |
FinishProduction |
Finish production | — |
ScheduleProduction |
Schedule operations | — |
ReplanShop |
Replan shop | — |
Registers#
WorkInProgress — Work in progress
Resources:
| Resource | Caption | Type | Required |
|---|---|---|---|
Qty |
Qty | Qty |
— |
Analytics:
| Analytic | Caption | Type | Required |
|---|---|---|---|
WorkInProgress-Cell |
WorkInProgress-Cell | — | Yes |
WorkInProgress-Item |
WorkInProgress-Item | — | Yes |
Table parts#
ProductionOrderComponents — Components
Used by: ProductionOrder.
| Field | Caption | Type | Required |
|---|---|---|---|
BaseQuantity |
Qty in base unit | Qty |
No |
Component |
Component | → Item |
Yes |
QtyRequired |
Qty required | Qty |
Yes |
Unit |
Unit | → UnitOfMeasure |
No |
ProductionOrderOperations — Operations
Used by: ProductionOrder.
| Field | Caption | Type | Required |
|---|---|---|---|
ActualMinutes |
Actual minutes | Decimal(18,4) | No |
CompletedOn |
Completed on | DateTime | No |
Employee |
Operator | → Employee |
No |
MachineNo |
Machine | Integer | No |
Name |
Name | String(160) | Yes |
RunMinutes |
Run minutes | Decimal(18,4) | No |
ScheduledOn |
Scheduled on | DateTime | No |
Sequence |
Sequence | Integer | Yes |
SetupMinutes |
Setup minutes | Integer | No |
WorkCenter |
Work center | → WorkCenter |