Routing
Updated
A routing is the operation recipe for a product. The first live row for that product wins, the same as a bill of materials. Steps hang off this card.
| Kind | Dictionary |
| Module | Production |
| Menu | Production → Dictionaries → Routings |
Fields#
| Field | Caption | Points at |
|---|---|---|
ID |
ID | number sequence |
Name |
Name | string |
Product |
Product | Item |
IsDisabled |
Disabled | boolean |
Name and Product are required. ID comes from RoutingSeq, which starts at 1000 and steps by 1. Empty Disabled is live.
Operations#
The list is RoutingOperation, caption Operations. It is a separate dictionary opened on this card. Production → Dictionaries → Routing operations is the same list.
| Field | Caption | Points at |
|---|---|---|
Routing |
Routing | this card |
Sequence |
Sequence | integer |
Name |
Name | string |
WorkCenter |
Work center | WorkCenter |
SetupMinutes |
Setup minutes | integer |
RunMinutesPerUnit |
Run minutes / unit | decimal |
Routing, Sequence, and Name are required. Sequence is unique per routing and must be 1 or greater. Minutes must not be negative. Expand bill of materials on a ProductionOrder copies these steps onto the order: Run minutes becomes Run minutes / unit times the order's base quantity, or Quantity when base quantity is zero.
There are no commands. This dictionary writes no register.
Who references this#
RoutingOperationfieldRouting- ProductionOrder command Expand bill of materials